Sector · CN 2716 00 00
Electricity
Country default values for electricity exported to the EU are built in: 0.718 tCO₂e/MWh for Türkiye (IR (EU) 2025/2621 Annex III). Actual emissions are used only when all five conditions of Annex IV are met; neither mark-up nor free allocation applies to electricity.
Generation sources
Whatever the source, the same rule.
Thermal, renewable or solar: unless the conditions are met, the country default value applies. Actual emissions require a PPA, a grid connection, the emission threshold, a TSO nomination and a verifier certificate together.
Thermal power plants
Coal, lignite, natural gas and fuel oil. Plants whose fossil emissions exceed 550 gCO₂/kWh cannot meet the actual-emissions condition; the country default value applies.
- Coal
- Lignite
- Natural gas
- Fuel oil
Renewable energy
Wind, hydro and geothermal. Own generation and PPA sources are defined separately; to use the actual (low) emissions, all five conditions must be met together.
- Wind
- Hydro
- Geothermal
- PPA
Solar energy
Photovoltaic and concentrated solar plants. Own solar generation is defined as its own source; for PPA sources, the GoO number and validity date are recorded.
- Photovoltaic
- CSP
- Own generation
- GoO record
Cross-border electricity
Electricity exported to the EU is declared under CN 2716 00 00, with the quantity in MWh. Actual emissions require a firm nomination to the interconnection capacity allocated by the TSOs.
- CN 2716 00 00
- MWh
- TSO nomination
- Interconnection
Default values
Country defaults, built in.
IR (EU) 2025/2621 Annex III sets country default values for electricity imported into the EU; Annex II is the factor for electricity consumed in producing goods. They are different values.
tCO₂e/MWh
Source: IR (EU) 2025/2621 Annexes II and III (31.12.2025). No benchmark is defined for electricity in IR 2025/2620.
Sector-specific capabilities
From source to border, every rule in place.
Default value for Türkiye built in
The Türkiye default value for electricity imported into the EU is 0.718 tCO₂e/MWh (IR (EU) 2025/2621 Annex III); it applies automatically when the conditions are not met.
Annex III country table
The 18 values in Annex III (including Türkiye, Georgia, Serbia, Ukraine, the United Kingdom and the EU aggregate) are built in.
Five conditions for actual emissions
PPA, grid connection, ≤550 gCO₂/kWh, TSO nomination and verifier certificate: when all five are declared, actual emissions are used; otherwise the country default.
Annex II and Annex III kept apart
The factor for electricity consumed in production (Annex II, Türkiye 2026: 0.420) and the default for imported electricity (Annex III, 0.718) are different values; Carbonaz uses the right table in each calculation.
PPA and GoO records
For PPA sources, the GoO certificate number and validity date are recorded.
Source types defined separately
Grid, own generation (solar, wind, other), cogeneration and PPA sources are each defined separately.
Thermal plant fuels
Separate emission factors are built in for coal, lignite, natural gas and fuel oil.
No free allocation for electricity
No benchmark is defined for electricity in IR 2025/2620, so free allocation (FAA) does not apply. The obligation is calculated from the Annex III default value or, if the conditions are met, from actual emissions.
CN 2716 00 00 · MWh
Electrical energy is in scope under CN 2716 00 00; the quantity is declared in MWh.
Versioned official tables
Factors are loaded from the official regulation tables as versioned reference data, with their source and validity date.
No mark-up for electricity
Even when the default value is used, no mark-up applies to electricity (IR (EU) 2025/2621 Annex III).
Native-language interface and support
Your team works in their own language. The interface, terms, documentation and support are available in multiple languages.
Actual emissions
If all five conditions are met.
With no free allocation for electricity, the CBAM factor does not apply; the only question is whether actual emissions or the country default is used. Actual emissions require all five conditions of Annex IV §5; if one is missing, the default value applies.
- (a)The electricity is covered by a power purchase agreement (PPA) between the declarant and a producer in the third country.
- (b)The installation is directly connected to the EU transmission system, or there is no physical congestion between them at the time of export.
- (c)The installation's fossil emissions do not exceed 550 gCO₂/kWh.
- (d)The electricity has been firmly nominated to the interconnection capacity allocated by all responsible TSOs, for the same period as its production.
- (e)The conditions are certified by an accredited verifier, with at least monthly interim reports.
Basis: Reg. (EU) 2023/956 Annex IV §5. The importer declares the conditions on the product; the declaration engine selects the actual or default value accordingly.
Frequently asked questions
Electricity CBAM Questions
Which emission factor is used for electricity?
Unless the five conditions are met, the country default value from IR (EU) 2025/2621 Annex III is used: 0.718 tCO₂e/MWh for Türkiye. The Annex II value of 0.420 is for electricity consumed in producing goods.
Does the 50-tonne de minimis exemption apply to electricity?
No. In the EU CBAM regulation the de minimis threshold applies to cement, iron & steel, aluminium and fertilizers. For electricity and hydrogen the obligation continues regardless of the import quantity.
Is there a special rule for cross-border electricity?
Yes: actual emissions require all five conditions of Annex IV §5. A PPA, connection to the EU transmission system (or no physical congestion), the 550 gCO₂/kWh threshold, a firm nomination to the TSOs' interconnection capacity and an accredited verifier certificate. If one is missing, the country default value applies.
Can I break down my renewable generation (hydro, wind, solar)?
Yes. Grid, own generation (solar, wind, other), cogeneration and PPA sources are defined separately; for PPA sources, the GoO number and validity date are recorded. To declare lower actual emissions, the five conditions must be met.
Which CN code is used for electricity, and does a benchmark apply?
CN 2716 00 00 (electrical energy) is built in and the quantity is declared in MWh. There is no free allocation (FAA) benchmark for electricity; the obligation is calculated from the Annex III default value (Türkiye 0.718 tCO₂e/MWh) or, if the conditions are met, from actual emissions.
A demo with your own export data.
In 30 minutes, with your own plant and export data, let's go through the five conditions and the default-value calculation together.