Sector · CN 72 · 73

Iron & Steel

On the scrap-EAF and DRI-EAF routes, charge, scrap, product and slag carbon enter the calculation as source streams, alongside fuel, electrode and precursor emissions. BF-BOF and smelting reduction (SR) are not supported: there is no waste gas or measurable heat model. CBAM 2026 benchmark values and the Annex II Scope 2 exemption enter the calculation automatically.

Hot-rolled coil · CN 7208
2 routesEAF · DRI-EAF · no BF-BOF or SR
CN 72 · 73479 iron and steel CN codes
Annex IIScope 2 exemption applied automatically
CBAM 2026Benchmark values built in

Production routes

Four routes, supported to different degrees.

The route changes the process and the emission sources. Scrap-EAF and DRI-EAF are supported; BF-BOF and SR are not supported.

BF-BOF

Blast Furnace and Basic Oxygen Furnace. Not supported: the waste gas attribution and measurable heat model this route requires are not in the platform, and mass balance is not enabled for it.

  • Hot metal
  • Coking coal
  • Limestone
  • BOF electrode

EAF

Electric Arc Furnace. Alongside fuel and electrode emissions, charge, scrap, product and slag carbon enter the calculation as source streams; CBAM 2026 benchmark values are defined and the Annex II Scope 2 exemption is applied automatically. Source streams are mandatory for 2026 and later periods; stock breakdown, biomass and process-level balance are out of scope.

  • EAF Carbon Steel
  • EAF High Alloy
  • Scrap metal
  • Electrode consumption

DRI-EAF

Direct Reduced Iron combined with EAF. Fuel emissions, product carbon as a source stream and the embedded emissions of precursors such as pellets are calculated. Source streams are mandatory for 2026 and later periods; stock breakdown, biomass and process-level balance are out of scope. The core route for green steel production.

  • DRI reduction
  • Natural gas
  • Pellet precursor
  • EAF integration

SR (Smelting Reduction)

Smelting reduction (HIsmelt, COREX, FINEX). Not supported: the waste gas attribution and measurable heat model this route requires are not in the platform, and mass balance is not enabled for it.

  • HIsmelt
  • COREX
  • FINEX
  • Bath smelting

Precursors

Every link in the chain, with its own code.

The embedded emissions of your iron and steel product include those of its precursors. Your supplier enters each precursor with its CN code and its own production route; every precursor adds a new ring to the trace.

Example chain: coil ← slab ← pig iron ← sinter
PrecursorCN
Sinter (agglomerated ore)2601 12 00
Pig iron7201
Ferro-alloys (FeMn, FeCr, FeNi)7202
DRI7203
Crude steel7206
Hydrogen2804 10 00

Calculation accuracy

CBAM 2026 benchmark data, built in.

The European Commission's official benchmark values are defined in the system. You do not need to enter them manually for the free allocation (FAA) calculation.

ProductAB
Hot-rolled flat steel · BF-BOFCN 7208 10 000.0441.370
Hot-rolled flat steel · DRI-EAFCN 7208 10 000.0440.481
Hot-rolled flat steel · scrap EAFCN 7208 10 000.0440.072
Pig ironCN 72011.0891.210
DRICN 7203 10 000.2950.397

A · excl. precursors · B · incl. precursorstCO₂e/t

Source: IR (EU) 2025/2620 Annex · Commission benchmark workbook (13.02.2026). Values vary by CN code and route; the table shows example rows.

Sector-specific capabilities

Your engineer doesn't apply the rules. The system does.

01

The Annex II Scope 2 exemption is applied correctly

In iron and steel, Scope 2 is calculated and reported but not included in the certificate obligation; sinter (2601 12 00) is outside Annex II, so its indirect emissions are included. Carbonaz makes the distinction automatically.

02

CN coverage: chapters 72 and 73

Chapter 72 (excluding 7204 scrap and most ferro-alloys), 7301–7311, 7318, 7326 and sinter 2601 12 00: 479 iron and steel CN codes are defined in the system and matched automatically when you add a product.

03

Multi-tier precursor supply chain

A multi-tier (N-level) supplier chain for precursors such as sinter, pig iron, DRI, ferro-alloys and crude steel. You can also collect data from your supplier's supplier.

04

The 80/20 actual-data target is tracked

The share of actual supplier data in precursors is tracked automatically in every calculation, with an alert as it approaches the platform's 80% data target. 80% is not a legal threshold; the share based on default values incurs a mark-up cost.

05

Automatic process type selection by production route

The appropriate process types (electrode consumption, limestone flux, DRI reduction) appear automatically based on the route you choose. Calculation for the BF-BOF and SR routes is not supported.

06

Mark-up rate correct for every year

For the share based on default values: 2026 +10%, 2027 +20%, 2028 onwards +30%, correctly coded. Year-by-year simulation projects future costs.

07

Free allocation schedule 2026 → 2034

The CBAM factor falls from 97.5% in 2026 to 0% in 2034. The schedule is recorded in the system; costs are projected for 2026–2030.

08

Immutable audit trail · 7-year retention

Every data entry, every calculation and every report is recorded so it cannot be changed retroactively. Ready for verifier review.

09

Separate benchmarks by product and route

Benchmarks are defined per CN code and route (BF-BOF, DRI-EAF, scrap EAF, high-alloy EAF), with values excluding (A) and including (B) precursors for the free allocation calculation.

10

Native-language interface and support

The interface, documentation and support are available in multiple languages. Your team works in its own language.

Free allocation schedule

From 2026 to 2034, free allocation is phased out.

Emissions up to the benchmark, multiplied by the CBAM factor, are deducted from the obligation. The CBAM factor is 97.5% in 2026, 51.5% in 2030 and 0% in 2034; the chart shows the share phased out. The schedule is recorded in the system; costs are projected for 2026–2030.

0%50%100%Today202620282030203220342.5%48.5%100%

Source: Directive 2003/87/EC Article 10a(1a) · IR (EU) 2025/2620

Frequently asked questions

Iron & Steel CBAM Questions

In iron and steel, are Scope 2 (indirect) emissions included in the CBAM certificate calculation?

No. Iron and steel fall under Annex II of the CBAM Regulation. Scope 2 emissions are calculated and reported but not included in the certificate obligation. The exception is sinter (2601 12 00): it is outside Annex II, so its indirect emissions are included in embedded emissions. Carbonaz applies this distinction automatically.

How is the calculation difference between the BF-BOF and EAF routes managed?

When you select the production route, the appropriate process types appear automatically. For EAF, charge, scrap, product and slag carbon are calculated as source streams alongside fuel and electrode consumption. Calculation for the BF-BOF route is not supported today: the waste gas attribution and measurable heat model it requires are not in the platform.

Which CBAM 2026 benchmark values are used for iron and steel?

The Commission benchmark values in IR (EU) 2025/2620 are defined in the system per CN code and route. For hot-rolled flat steel (CN 7208 10 00), for example, the value including precursors (B) is 1.370 for BF-BOF, 0.481 for DRI-EAF and 0.072 tCO₂e/t for scrap EAF; for pig iron it is 1.089 (A) and 1.210 (B). You do not need to enter these values manually for the free allocation (FAA) calculation.

How are precursor emissions such as pig iron, DRI and sinter collected?

Through a multi-tier supply chain, precursor emissions are collected to the end of the chain: each supplier enters its precursors with their CN codes and its own route. The share of actual supplier data is tracked, with an alert when it falls below the platform's 80% data target; the share based on default values incurs a mark-up cost.

Which iron and steel CN codes are supported?

The CBAM-covered codes of chapter 72 (excluding 7204 scrap and most ferro-alloys such as ferro-silicon), headings 7301–7311, 7318 and 7326, and sinter 2601 12 00 are defined in the system: 479 iron and steel CN codes in total, matched automatically when you add a product.

A demo with your installation's route.

In 30 minutes, with your own route and products, let's draw the first trace of your chain together.